Projects
Assab work closely with all our clients to ensure the solution we provide is bespoke and can meet the requirements of their work and the needs of their staff.
-
Medical Schools – Biomedical and Cardiovascular Buildings, Glasgow
-
Education – University of Glasgow, Bower Building, Glasgow The installation of laboratory furniture to the newly rebuilt building.
-
Medical Schools – Medspan Project, University of Newcastle Installation of ASSAB modular laboratory furniture
-
Education – Imperial College - HVAC and Level 4 Refurbishment Project, London Refurbishment of the building facilities to provide new secure accommodation.
-
Education – St Mary's Campus Redevelopment, London installation of ASSAB modular laboratory furniture for the Immunovirology Department
-
Industrial – International Paint, Felling, Installation of laboratory furniture to the new technical centre.
-
Education – University of Newcastle, Newcastle, UK State of the art facilities for state of the art science
-
Healthcare and Hospitals – Kings College, Guy's Hospital, London, UK installation of ASSAB modular laboratory furniture over two floors.
-
Industrial – Applied Biosystems, Warrington, UK
Healthcare and Hospitals
Kings College, Guy's Hospital, London, UK
The project involved installation of ASSAB modular laboratory furniture to the 17th and 27th Floor of Guy’s tower. This included a variety of special cupboards, shelving and benching. The sinks were grey epoxy with a glazed splashback and drying rack. The modular furniture ensures that the department has the flexibility to alter the layout should future developments demand. All cupboards are mobile on castors and shelving is adjustable in height ensuring maximum flexibility within the laboratory area.
ASSAB installed the write up benching within this project. This involved speckled Trespa worktops and shelving.
Value: £105k