Projects
Assab work closely with all our clients to ensure the solution we provide is bespoke and can meet the requirements of their work and the needs of their staff.
-
Medical Schools – Biomedical and Cardiovascular Buildings, Glasgow
-
Education – University of Glasgow, Bower Building, Glasgow The installation of laboratory furniture to the newly rebuilt building.
-
Medical Schools – Medspan Project, University of Newcastle Installation of ASSAB modular laboratory furniture
-
Education – Imperial College - HVAC and Level 4 Refurbishment Project, London Refurbishment of the building facilities to provide new secure accommodation.
-
Education – St Mary's Campus Redevelopment, London installation of ASSAB modular laboratory furniture for the Immunovirology Department
-
Industrial – International Paint, Felling, Installation of laboratory furniture to the new technical centre.
-
Education – University of Newcastle, Newcastle, UK State of the art facilities for state of the art science
-
Healthcare and Hospitals – Kings College, Guy's Hospital, London, UK installation of ASSAB modular laboratory furniture over two floors.
-
Industrial – Applied Biosystems, Warrington, UK
Education
University of Newcastle, Newcastle, UK
The Nanotechnology Department was commissioned in 2003 and is one of the country’s foremost Centres of Excellence in this specialist field.
Assab installed laboratory furniture and Protex high performance fume cupboards in the clean room and laboratory areas.
The Assab benching with suspended cabinets ensures that the department has the flexibility to alter their laboratories should future developments demand whilst maintaining optimum hygiene in the clean environment.
The fume cupboards include stainless steel linings to one unit and have an exceptional containment value of 0.01ppm (SF6) which is a factor of 10 times greater than that specified as the base threshold within BS7258.